School Bond Requests

Original posting: 11/04

ABIA JUDD ELEM. SCHOOL  
New roof $180,000
Classrooms (4) $450,000
Parking/Field renovation $200,000
Erosion control sidewalks $25,000
Kindergarten playground $25,000
Security fencing $10,000
Resurface BB/asphalt $50,000
Shade in the child pick-up area $10,000
SUBTOTAL $950,000
   
LINCOLN ELEM. SCHOOL  
Classrooms $200,000
Soffits/facia/guttering $20,000
Carpeting $24,000
Painting $15,000
Asphalt back lot $25,000
Seal coating $5,000
SUBTOTAL $289,000
   
MILLER VALLEY ELEM. SCHOOL  
Resurface parking lot/fire lane $90,000
Renovate restrooms $100,000
Carpeting $65,000
Classrooms (6) $600,000
Abate/renovate boiler/office space $25,000
Interior/exterior paint $78,000
Remove radiators/install shelves $35,000
HVAC Room 18 $3,000
Resurface field (backstops, goals, etc.) $90,000
Gym/main building breezeway $50,000
Install new drinking fountains $20,000
Playground gravel contain/concrete repair $9,000
Resurface cafeteria floor $7,000
Repair/strengthen floor joists/supports $8,000
Upgrade fire sprinkler system to code $120,000
Redesign/relocate office $0
SUBTOTAL $1,300,000
   
TAYLOR HICKS ELEM. SCHOOL  
Gymnasium/cafeteria $1,500,000
Electrical circuits $75,000
Classrooms (6) $650,000
Resurface field $110,000
Abate/empty boiler room $5,000
Carpeting $60,000
Bus turnaround $75,000
SUBTOTAL $2,475,000
   
WASHINGTON TRADITIONAL SCHOOL  
Soffit repair $25,000
Abate & remove boiler (storage) $8,000
Basement restroom renovation $20,000
Carpeting (2/3 of classroom & hall) $35,000
Window repair $20,000
Artificial lawn $50,000
SUBTOTAL $158,000
   
GRANITE MOUNTAIN MIDDLE SCHOOL  
Paving/renovating BB & VB courts & sidewalk $60,000
Paving $17,500
Refurbish lockers/locks + 75 new $35,000
Skill/strength structure, pavilion grading $120,000
Renovate gym restrooms (repair) $10,000
Grade & seed football field (sprinklers) $10,000
Carpeting/tile/asbestos removal $50,000
Staff restrooms $15,000
Bleacher replacement (lower gym) $35,000
New ceiling in cafeteria $10,000
Erosion control/landscape at bus area $25,000
Stage curtains $50,000
SUBTOTAL $437,500
   
MILE HIGH MIDDLE SCHOOL  
Little gym roof $115,000
Big gym floor $20,000
Big gym paint $15,000
Stage $5,000
Carpeting $55,000
Lightning protection $100,000
Equipment storage shed $10,000
HVAC Hendrix $180,000
Equipment storage shed $10,000
Curtains/riggin $60,000
Paving $10,000
Irrigation sprinkler system (quad & field) $100,000
Stage lighting $50,000
SUBTOTAL $720,000
   
PRESCOTT HIGH SCHOOL  
Pave existing dirt parking lot $450,000
Outdoor lighting, dirt lot, and N/W side bldg $135,000
New cafeteria $2,300,000
Add 1 new, renovate 5 science rooms $810,000
Renovation of 6 science to regular rooms $33,000
Remodel MPR into bookstore 4 rooms $780,000
Computer infrastructure in all school $200,000
New band room $680,000
Renovate old band room $20,000
Resurface bleachers $100,000
New flooring, hallway 13 rooms $90,000
Tile replacement $25,000
HVAC in weight room and computer lab $135,000
New photo lab $45,000
SUBTOTAL $5,803,000
   
DEXTER FAMILY RESOURCE CENTER  
New roof/fascia work $130,000
Paint buildings A & B (exterior) $40,500
Fire sprinkler system $20,000
Remodel restrooms $20,000
Fire system for Building B $20,000
Asphalt sealing/striping $15,000
HVAC $200,000
Replace windows (Bldg. B) $2,000
Capping for brick supports $1,000
Replace driveway gate $1,000
Landscaping/sprinkler materials $3,000
SUBTOTAL $452,500
   
SERVICE CENTER  
84-passenger buses (15) replacement $1,622,970
Special needs buses (4) replacement $355,666
14-passenger buses (6) replacement $397,230
1 Special needs bus w/wheelchair lift $113,973
SUBTOTAL $2,489,839
   
CENTRAL KITCHEN  
New parking lot $64,000
New roof $20,000
New flooring tile $10,000
Dishwashing machine $40,000
HVAC $40,000
Outdoor freezer/slab $35,500
Expand facility by 1,000 square feet $60,000
SUBTOTAL $269,500
   
DISTRICT OFFICE  
Roof $36,000
   
DISTRICT-WIDE  
Lock/hardware $280,000
Network infrastructure (elem) $25,000
Design fees @ 8% $952,440
Bus shelters (all schools) $150,000
Asbestos abatement $120,000
Legal fees $150,000
Infrastructure (all schools) $1,610,534
SUBTOTAL $3,287,974
   
TOTAL $18,668,313